Step-by-step checklist to safely bring your vehicle back to life after extended storage
Before attempting to start the vehicle
Walk around the vehicle and check for any visible damage, pest intrusion, or debris accumulation during storage.
Check tire pressure and look for flat spots from sitting. Inflate to recommended pressure if needed.
Ensure brakes aren't seized or corroded. Pump the brake pedal a few times to build pressure before attempting to drive.
Bringing the power system back online
Verify the battery state before attempting to start. The battery should show adequate charge on the dashboard.
Remove any corrosion that may have developed during storage. Use a wire brush if necessary.
Ensure a complete charge cycle before first use to calibrate the battery management system.
Verify the 12-volt accessory battery is holding charge properly and maintaining electronics.
Verify all electrical components function correctly
Check headlights, brake lights, turn signals, and hazard lights are all working properly.
Verify all warning lights function correctly on startup and clear as expected after system checks.
Ensure the horn is working for safety purposes.
Check the 10.1" screen powers on correctly and Apple Play/Google Play connectivity works.
Test mechanical components before driving
Check that power steering feels normal when turning the wheel with the vehicle on.
Test power brakes at low speed in a safe area to ensure they respond properly.
Pay attention to any squeaking, grinding, or rattling that wasn't present before storage.
Take it slow and test gradually
Take a short, low-speed test drive first in a safe, controlled area.
Gradually test acceleration, braking, and steering during the first drive.
Pay attention to any unusual vibrations or noises that may indicate issues.
Keep the first few drives short to ensure everything is working properly before longer journeys.
Critical steps for safe reactivation
These issues require professional attention
Our team is here to help you get back on the road safely
Follow this checklist and your Volta will be ready for many more miles
Starting from
744,000 EGP — 12 x 62,000 EGP/month